S24/U-GTE – preconfigured for decoupling protection, to be set according to the Enedis specification
The S24/U-GTE starts from a configuration oriented towards decoupling protection: the functions required for this use are enabled at the factory. Two setting steps nevertheless remain your responsibility before commissioning: first, the fine tuning of the protection thresholds and time delays, which is essential to make the installation compliant with the Enedis reference document applicable to decoupling protection; second, the configuration of the relay’s control and command, to be carried out with the EuroCAP software, made available free of charge on our website. A sealable cover is supplied with this version, but it is neither fitted nor drilled: its preparation and installation remain to be carried out on site. This version suits teams that have the in-house skills and time required to carry out these settings and wish to keep direct control over them. To support you, we run a quarterly webinar dedicated to the presentation of the S24/U-GTE relay and the EuroCAP software.